Baseline data must be collected in an on-going manner and cannot be computed by formal study of historical project data
The terms measure, measurement, and metric all share the same definition according to the IEEE Standard Glossary of Engineering Terms.
Process Indicators enable a software project manager to
Which of the following items are not measured by software project metics ?
Software quality and functionality must be measured indirectly
Which of the following are advantages of using LOC (lines of code) as a size-oriented metic ?
There is no need to reconcile LOC and FP measure since each in meaningful in its own right as a project measure
Object-Oriented project measure may be combined with histroical project data to provide metics that aid in project estimation
Use-Case Oriented metrics are computed directly from UML diagrams they are often used as normalizations measures.
Which of the following is not a measure that can be collected from a web application project ?
Which of the following softwares quality factor is mostly likely to be affected by radical changes to computing architectures ?